Construction Update 10-18

This week, window installation has begun, with the frames being installed on the first floor. This picture shows the lobby, which will have several windows and get lots of light! This side of the lobby will look out onto the patio area.

Sorry, comments are closed for this post.

 

HOME | ABOUT US | VISTAS APARTMENTS | ACCESSIBILITY EDUCATION | DONATE | CONTACT

Maximum Accessible Housing of Ohio • 1725 East 115th Street, Cleveland, OH 44106

216-231-7221 • TTY: 711 • info@mahohio.org

equal housing opportunity logo    wheelchair symbol             facebook symbol    youtube symbol